Select Page

In 1978, the Army Corps of Engineers produced Preliminary Feasibility Report on Shallow-Draft Navigation to evaluate various action plans for the Grand River. Included in the potential plans were dredging, limited dredging, clearing obstructions with no dredging, creating a Valley Preserve, and taking no action at all. In the end, it was determined not to engage in dredging and what has emerged since then is a modified version of the Valley Preserve plan which is being carried out by the Ottawa County Parks through its Grand River Greenway and Grand River Heritage Water Trail initiatives.

View the full report (12MB PDF)

 

Image was taken from the the front page of the report.